Application of MPCS in the Retrofit of 1.5MW Pitch System
In the field of wind energy technology, continuous upgrades are crucial to enhance efficiency and reliability. the MPCS-BG0002 technical retrofit project focuses on upgrading the 1.5MW pitch system and has become a model of innovation. This article will focus on its successful application in the first wind turbine in Urumqi, Xinjiang.
Application direction and pitch solution
The MPCS-BG0002 project aimed at upgrading the 1.5MW pitch system with a 7-cabinet, 1-master and 1-slave configuration. This setup optimises the pitch system and improves performance and reliability.


Benefits and Features
The MPCS-BG0002 technical upgrade project has multiple advantages. Firstly, the original cabinet PTP installation simplified the system and optimised operation. Second, its full compatibility with the original control system ensures a smooth transition. Finally, the operational efficiency of the system was significantly improved to ensure excellent performance.
Turbine grid connection time
The MPCS-BG0002 technical improvement project was successfully applied in June 2020 to the first 1.5MW wind turbine in Urumqi, Xinjiang.
All in all, the MPCS-BG0002 retrofit project has excelled in upgrading the 1.5MW pitch system.