  In the field of wind energy technology, continuous upgrades are crucial to enhance efficiency and reliability. the MPCS-BG0002 technical retrofit project focuses on upgrading the 1.5MW pitch system and has become a model of innovation. This article will focus on its successful application in the first wind turbine in Urumqi, Xinjiang.

Application direction and pitch solution
The MPCS-BG0002 project aimed at upgrading the 1.5MW pitch system with a 7-cabinet, 1-master and 1-slave configuration. This setup optimises the pitch system and improves performance and reliability.

 

Benefits and Features
  The MPCS-BG0002 technical upgrade project has multiple advantages. Firstly, the original cabinet PTP installation simplified the system and optimised operation. Second, its full compatibility with the original control system ensures a smooth transition. Finally, the operational efficiency of the system was significantly improved to ensure excellent performance.

Turbine grid connection time
  The MPCS-BG0002 technical improvement project was successfully applied in June 2020 to the first 1.5MW wind turbine in Urumqi, Xinjiang.

  All in all, the MPCS-BG0002 retrofit project has excelled in upgrading the 1.5MW pitch system.

Previous

Next

Message

We can serve you. We are your reliable contact. In addition to the availability of our phone,

you can also leave us a message and we will contact you as soon as possible

Submit